About us
Certified Excellence
Our manufacturing facility holds industry, leading certifications, ensuring the highest standards of quality, safety, and environmental responsibility in every product we create.

Quality Manufacturing at Every Stage
Every Quiet Cabin is subject to multi stage quality checks, including:
- Material inspection prior to assembly
- Structural and sealing verification during build
- Final inspections before crating and shipment
Our cabins are designed to meet commercial expectations, with standardized components that support long term use, servicing, and future expansion.
Most Common Questions
Whats the Average Lead time?
Most Quiet Cabins are delivered between 5-7 Business Days from order confirmation.
For in-stock models or standard configurations, timelines can be shorter. Bulk orders, custom finishes, or compliance requirements may extend lead times slightly, but we confirm all timelines upfront before payment is finalized no surprises.
How Sound Proof Are the Booths?
Quiet Cabins are engineered to significantly reduce external noise and distractions, creating a calm, private environment for calls, meetings, and focused work.
Rather than over-promising lab-only ratings, we design for real-world performance the kind that actually improves clarity, comfort, and productivity in offices, schools, and shared spaces.
Is there any guarantee / warranty when buying?
Yes. Every Quiet Cabin includes a manufacturer backed warranty covering structural components and workmanship.
We also stand behind our process from pre-sale guidance to post-delivery support ensuring your cabin performs as expected and integrates smoothly into your space.
Details vary by model and use case, and our team is always available to walk you through what’s covered.

Designed for Real World Use
Quiet Cabins are built specifically for:
- Corporate offices
- Universities and libraries
- Healthcare and non-profit environments
- Design-forward commercial spaces
That means durability, clean aesthetics, and performance you can rely on. Quiet Cabins are not experimental products or consumer-grade shortcuts.
Assembly FAQs
How Long Does it Take To Assemble?
Assembly takes the average 2 person crew 2-4 hours to assemble
How Many People Do I Need to Assemble a Quiet Cabin?
it is recommended to have a 2 man team for all Booths and Models.
Are Quiet Cabins Heavy?
Quiet Cabins weigh roughly 625lbs - 950lbs per booth so yes they are heavy.
